
DHES-DC240-1200KW Full Matrix Overcharge Reactor
Keyword:
Classification:
Charging pile

E-mail:
Product overview
The ultra-fast charging stack adopts the architecture of module cabinet and charging terminal. The module cabinet includes 360 ~ 480kW. One module cabinet can have multiple fast charging terminals and one super charging terminal. This product adopts high-performance embedded system design platform, with multiple protection functions, humanized picture prompt function and automatic charging control. The product supports real-time communication between Ethernet, 4G and other communication interfaces and the monitoring center or the operation management center, and accepts the instructions of the monitoring center to limit the maximum output power of the charging stack, etc., and monitors the charging connection status in real time. If the connection is abnormal, the charging will be terminated immediately, ensure personal and vehicle safety during charging.
Product Features
High utilization, no duplication of investment, low operating costs
High energy conversion rate, long service life, low investment risk
Flexible charging: It can meet the needs of different models, automatically predict the charging time and charging power, and flexibly adjust the output power and output voltage.
Shorten charging time: Minimize charging time, reduce charging costs, shorten logistics and distribution time, and reduce energy consumption
Multiple protection: with overload, overvoltage, undervoltage, short circuit and other protection functions
Intelligent control: the system integrates charging detection, charging control, management, query, display and communication
Easy to maintain: Damaged modules can be quickly replaced, reducing maintenance costs and maintenance time.
Maximum output current: 600A
Size: host 1500mm * 1100,mm * 1900mm/set
Terminal 500mm * 300mm * 1500mm/set